“Evaluation of Residual Risks in an Oil Construction Project Using Fuzzy SAW and Risk Matrix Methods” (2025) Research Annals of Industrial and Systems Engineering, 2(2), pp. 81–92. doi:10.22105/raise.v2i2.46.